Day 8 of the new kitchen

Standard

31 October 2016

Like life, good news and bad.

Given all the decorating I have done, it was disappointing that they moved a couple of sockets and a cable in the wall. Plus the ceiling BT the plasterer missed. The net result, is more painting required.

On the positive, lots of progress, when I arrived back with Maria at 10, there were 5 people working in the kitchen including the plasterer.

Roll on Wednesday when the electrician comes back, and hopefully lights ???

Looking after Maria – cakes

Standard

31 October 2016

Looking after Maria today. Had to pop back to Ashbourne, and did a bit of shopping. Maria decided a cake was required from Waitrose.

I think she is enjoying it. Aidan didn’t lose out we got him a lovely gingerbread Halloween biscuit.

Day 7 of the new kitchen

Standard

30 October 2016

After the game, and a nice meal at Steve & Julie’s we head home to get on with the decorating.

A very long night, didn’t finish painting until 02:20, and then up again at 7 for more of the same, finishing at 17:00.

Can’t say I recommend this approach.

Good news is that the kitchen is ready for the workmen on Monday, except for a bit of plastering they missed.

The bad news is that there is a lot of work to do in the dining room

Late for the game

Standard

29 October 2016

Plasterers here all morning. I had hoped they would be finished by lunch, and time for me to get to the match. Should have known better, they finished just before 2:30, so off I went to the match.

Arrived late, apparently missing Sheffield Wednesday’s best spell. It was a good game and we won 2:0. Which sounds better than it was. Put in perspective both goals were scored by our defenders, and this was the first time this year we have scored 2 goals at home.

Day 6 of the new kitchen

Standard

29 October 2016

Up early at Steve & Julie’s and out of their door at 7:10 to drive back home so I can let the plasterers in.

They have done a good if messy job, with lots of plaster about

.

Looks like a very long day tomorrow cleaning up and repainting……

The other downside, doesn’t look like I will get to today’s Derby v Sheffield Wednesday game on time…..

Day 5 of the new kitchen

Standard

28 October 2016

The latest opportunity is that the paint we ordered 14 days ago came to the shop yesterday but was the wrong colour, eventually got it today….

Up early and painted the beams in the dining room, and the walls. Then off to Nottingham to see friends.

A lovely time with Steve, Julie and Sophie, able to briefly forget the kitchen and enjoy a lovely meal with them.

Day 3 of the new kitchen

Standard

26 October 2016

Today is plastering day. They were here for 45 minutes, and then went away to have their breakfast. Why didn’t they have breakfast and turn up 30 minutes later….

Having said that, they have done a very good job. They even did an extra job for us, plastering the ceiling in the lounge where we had a water leak 2 years ago.

A bit of a shock

Standard

25 October 2016

Went for a walk this afternoon, and came across an electric fence. Wasn’t too concerned as they normally just give you a little tingle.

However after stepping over it a lady came out to tell me she didn’t have enough time to switch it off. Apparently it was connected to the mains…. she said the horses have thick fur, so needs a strong shock. She then said I would probably make my hair curly, food for thought.